Availability
Overview
Any access level comes with permissions for adding and/or editing expenses in both member and non-member project permissions, i.e. for projects where the user is a member and projects where it is not.
Note
A prerequisite for using the permissions is the "Access billing information" global permission.
The permissions are as follows:
- Log expenses
- Edit actual expenses
- Edit planned expenses
The two last permissions cannot be enabled without the first one, Log expenses, being enabled too.
Expense permissions as they appear in a project access level are illustrated below:
Actions
The actions the permissions unlock in combination are summarized in the sections below. The case when all are enabled is not included as it's self-evident: it gives full control over expenses both at the project and activity level. See the sections below for actions that each option enables.
Log expenses
The actions available for the solitary Log expenses permission enabled are summarized in the table:
Actions | Actual, project1) | Actual, activity | Planned, project2) | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other3) | own | other | own | other | own | other | |
Add | n/a4) | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert5) | n/a | n/a | n/a | n/a | ||||
1)
Actual = actual expenses; project = project level; activity = activity level.
2)
Planned = planned expenses, project = project level.
3)
Other users' expenses.
4)
Not applicable, e.g. since adding expenses for other people is not possible.
5)
Convert planned expenses into actual expenses.
|
Log expenses + Edit actual expenses
The actions available for the combination of Log expenses and Edit actual expenses permissions are summarized in the table:
Actions | Actual, project | Actual, activity | Planned, project | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other | own | other | own | other | own | other | |
Add | n/a | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert | n/a | n/a | n/a | n/a |
Log expenses + Edit planned expenses
The actions available for the combination of Log expenses and Edit planned expenses permissions are summarized in the table:
Actions | Actual, project | Actual, activity | Planned, project | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other | own | other | own | other | own | other | |
Add | n/a | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert | n/a | n/a | n/a | n/a |