Availability
Overview
Any access level comes with permissions for adding and/or editing expenses in both member and non-member project permissions, i.e. for projects where the user is a member and projects where it is not.
The permissions are as follows:
- Add own
- View all
- Edit all actual
- Edit all planned
In this article
The two last permissions cannot be enabled without the first one, Log expenses, being enabled too.
Note
A prerequisite for using the permissions is the "Access billing information" global permission.
Expense permissions as they appear in a project access level are illustrated below:
Actions
The actions the permissions unlock in combination are summarized in the sections below. The case when all expense permissions are enabled is not included as it's self-evident: it gives full control over expenses both at the project and activity level. See the sections below for actions that each option enables. Permissions enabled automatically when a permission is enabled are given in the parentheses. For example, View all (+ Add own) means that, for all four permissions disabled initially, when View all is enabled, Add own is turned on automatically. By the same token, disabling Add own will disable View all with it.
Add own
The actions available for the solitary Add own permission enabled are summarized in the table:
Actions | Actual, project1) | Actual, activity | Planned, project2) | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other3) | own | other | own | other | own | other | |
Add | n/a4) | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert5) | n/a | n/a | n/a | n/a | ||||
1)
Actual = actual expenses; project = project level; activity = activity level.
2)
Planned = planned expenses, project = project level.
3)
Other users' expenses.
4)
Not applicable, e.g. since adding expenses for other people is not possible.
5)
Convert planned expenses into actual expenses.
|
View all (+ Add own)
When View all permission is enabled (with Add own activated automatically), the following actions are available:
Actions | Actual, project | Actual, activity | Planned, project | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other | own | other | own | other | own | other | |
Add | n/a | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert5) | n/a | n/a | n/a | n/a |
Edit all actual (+ View all + Add own)
The actions available for the combination of Edit all actual + View all + Add own permissions are summarized in the table:
Actions | Actual, project | Actual, activity | Planned, project | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other | own | other | own | other | own | other | |
Add | n/a | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert | n/a | n/a | n/a | n/a |
Edit all planned (+ View all + Add own)
The actions available for the combination of Edit all planned + View all + Add own permissions are summarized in the table:
Actions | Actual, project | Actual, activity | Planned, project | Planned, activity | ||||
---|---|---|---|---|---|---|---|---|
own | other | own | other | own | other | own | other | |
Add | n/a | n/a | n/a | n/a | ||||
Edit | ||||||||
View | ||||||||
Convert | n/a | n/a | n/a | n/a |